Develop the technical feasibility study on the "Inculcation of technology for thickening waste from the concentration plant"

 Develop the technical feasibility study on the "Inculcation of technology for thickening waste from the concentration plant"

Customer:

"Erdenet"SOE

Location:

Orkhon province, Bayan-Undur sum

Implmented date:

2021

Project details

Within the technical feasibility study for the introduction of tailings thickening technology at the concentration plant, a tailings thickener with a capacity of 40 million tons per year, a thickened tailings pumping station, a water purifier for molybdenum concentrate, a settling pool, a circulating water pumping station, and transmission lines for various purposes were comprehensively planned.