Develop the technical feasibility study on the "Inculcation of technology for thickening waste from the concentration plant"
Customer:
"Erdenet"SOE
Location:
Orkhon province, Bayan-Undur sum
Implmented date:
2021
Project details
Within the technical feasibility study for the introduction of tailings thickening technology at the concentration plant, a tailings thickener with a capacity of 40 million tons per year, a thickened tailings pumping station, a water purifier for molybdenum concentrate, a settling pool, a circulating water pumping station, and transmission lines for various purposes were comprehensively planned.