Projects
/
Environment
Technical Feasibility study and design consulting services to increase the flow of the Ulz River /Dornod, Kherlen sum/ of the Onon-Ulz" project
Customer:
Governor's Office,Dornod province
Location:
Khentii province,Dadal sum, Norovlin sum, Dornod province, Bayan-Uul sum, Bayandun sum, Dashbalbar sum, Chuluunkhoroot sum, Gurvanzagal sum
Implmented date:
2019
Project details
Within the "Onon Ulz" project, to increase the flow of the Ulz River was developed technical feasibility study. In this study a water transfer facility will be constructed 2 km away from the Onon River, and works related to adjust the flow by contsruction a reservoir a Tee port with a length of 670m, a height of 9m and a volume of 27.0 million cubic meters on the Ulz River were developed.