Design and budget for the Ф900mm new network line from the North-East Reservoir to the Tasgan Reservoir.

Design and budget for the Ф900mm new network line from the North-East Reservoir to the Tasgan Reservoir.

Customer:

Capital Investment Department

Location:

Ulaanbaatar, Bayanzurkh district

Implmented date:

2015

Project details

The design  of 900 mm diameter 4 km long water supply and sewerage 1.7 km long 9b collector line with a 600 mm diameter has been developed.