Projects
/

Construction and Installation work

Construction and installation work of flow-regulating reservoir near the Emt’s chute channel for the purpose of protecting Arvaiheer soum from floods.

Construction and installation work of flow-regulating reservoir near the Emt’s chute channel for the purpose of protecting Arvaiheer soum from floods.

Customer:

Governor office of Uvurkhangai Province, Land Relations, Construction, and Urban Development Authority of Uvurkhangai Province

Location:

Uvurkhangai Province, Arvaiheer soum

Implmented date:

2024

Project create

Contstructed by D.Ganbat, E.Temuujin, O.Munkh-Erdene

Project details

In order to guard against flooding, a 40,000 m3 earthen embankment has been constructed next to the Emt's chute channel source in Arvaikheer soum, Uvurkhangai aimag. The earthen embankment has reinforced concrete slabs on the upper side and a geomembrane. The embankment's crest height is 8 meters, its length is 97.4 meters, its width is 6 meters, its water discharge channel is 36 m, and its drainage pipe is 48 m.